*
*
Electrical panel Permit requirements The on-line allow is available for properties in sdrta.net v a residential zoning district. Zoning district info is obtainable on-line by clicking E-Zoning.

You are watching: 2/0 copper wire for 200 amp service

This permit will permit replacement that the existing electric panel up to a maximum of 200 amps in the exact same location.Note: part properties in sdrta.net have an underground electric power feeding from PG&E. If your property has actually an underground strength feed, verify v PG&E that they can carry out increased strength for a larger panel size.To recognize if the proposed dashboard is sized as necessary for your demands OR if you want to view if the proposed panel is large enough because that an all-electric house, please complete an electrical panel sizing spreadsheet. An electric permit is forced for replacement and upgrade that the main electrical service panel before installation of the new panel. Complying with is a listing the the general requirements for electrical panel replacements based on the 2019 California electric Code. This catalog is intended to administer general information, contact the structure Safety department for any type of questions or added information.General Requirements - The key electrical organization shall be set up with strictly conduit. Electrical metallic tubing might be supplied where the company drop is attached come the building. The company entrance cable may be used, noted the authorized fittings are provided with the cable, such as a rain-tight company head or forming the cable goose-neck, taped or painted, and also held securely in location by a fitting authorized for the purpose. (Article 230)The minimum size company conduit shall it is in 1-1/4”. The minimum size business entrance cable shall be rated 100 amperes minimum for single family dwellings. For solitary family homes, the company disconnect means shall have a rating of less than 100 amperes, 3-wire. A larger company may be forced for brand-new homes or additions to existing homes based upon the actual pack calculations. (CEC 230.79(C))Service entrance Conductors (Wires) – Conductors that extend throughout a roof shall have actually a minimum vertical clearance the 3’ above the roof surface for roofs sloped 4:12 or an ext (18” clearance compelled when conductors enter through the roof overhang/eave). The service head candlestick be located so the the service drops, in addition to the open wires between the company head and service drop, will have actually a minimum clearance that 10’ vertically over ground and also 3’ radius from doors and also windows. (Article 230.24)The neutral (grounded) conductor must be figured out with white tape at both terminals. (Article 200.6(B)(4))Service enntrance gate conductors and also cables shall be approved for a wet place and, when exposed to direct sunlight, chandelier be listed and significant as “sunlight resistant.” service entrance conductors and also conduit chandelier be sized according to the complying with table (based top top CEC thing 9 table 1):
SERVICE enntrance gate CONDUCTORS SIZE and RATING
Service or Feeder RatingCopper ConductorsAluminum or Copper-CladAluminumMinimum ConduitSize
100 Amps#4 AWG#2 AWG1 ¼ inch
125 Amps#2 AWG#1/0 AWG1 ¼ inch
150 Amps#1 AWG#2/0 AWG1 ¼ inch
200 Amps#2/0 AWG#4/0 AWG1 ½ inch
The ground connection conductors should be figured out by white or grey tape in ~ both ends (200.6).Meter location - PG&E needs the height of the meter to it is in 48” come 66” above the ground. PG&E prohibits new meters ~ above exterior walls surrounding to bedrooms or bedroom closets. A minimum horizontal clearance of 36” native the gas meter and also piping is required.

See more: How Many Calories In 1 Chocolate Chip Cookie Nutrition Facts

Working space - The clear working space in former of the dashboard shall it is in 30” large by 36” deep v a minimum headroom clearance that 6’-6” (Article 110.26)Grounding of Services - ground connection shall consist of a constant grounding electrode conductor operation from the dashboard to a ground rod (grounding electrode) and also to the cold water pipe. Ground connection of the electrical organization at the key water line must be in ~ the an initial 5’ the water piping into the building. The underground water business shall no be offered as the ground connection electrode without supplemental electrode. For brand-new structures and additions to currently structures, a concrete encased floor electrode shall be installed. This chandelier consist that 20’ that ½” ceiling or zinc-coated rebar or bare copper wire in the part of the footing in contact with earth. (CEC 250.52(A)(3)(1) and also 250.52(A)(3)(2))For present structures, the ground connection electrode shall it is in nonferrous (copper), listed, and also not be less than 5/8” in diameter. The electrode candlestick be set up such that at the very least 8’ of length is in contract with the soil. The upper finish of the electrode shall be flush through or listed below ground level uneven the above-ground end and the grounding electrode conductor attachment is protected versus physical damage. (CEC 250.52 (A)(5), 250.64(B))The required grounding electrode conductor (from electrode come panel) size is detailed in the following table:
GROUNDING ELECTRODE CONDUCTOR SIZING (Table 250.66)
Size of key PanelCopper ConductorsAluminum or Copper-Clad Aluminum
100 Amps#8 AWG#6 AWG
125 Amps#8 AWG#6 AWG
150 Amps#6 AWG#4 AWG
200 Amps#4 AWG#2 AWG
Bonding - Bonding of the hot, cold, and gas currently is compelled when the electric panel is replaced. Bonding that the hot, cold, and gas present is compelled with water business replacements (if using a less conductive product than is existing) and for all re-pipes. Bonding candlestick consist of a consistent bond jumper set up at the water heater between the hot, cold, and gas lines. The bonding jumper shall be sized based upon the adhering to table. (CEC250.4(A)(4))
BONDING JUMPER SIZING (Table 250.102(C)(1))
Size of key PanelCopper ConductorsAluminum or Copper-Clad Aluminum
100 Amps#8 AWG#6 AWG
125 Amps#6 AWG#4 AWG
150 Amps#6 AWG#4 AWG
200 Amps#6 AWG#4 AWG
The electric Panel permit is NOT accessible on-line if you are: installation the new electrical dashboard in a various location. installing a new electrical panel bigger than 200 amps. Installing additional sub-panels v the new electrical panel. Performing additional electrical work-related in conjunction through the new electrical dashboard installation.
If any type of of the above conditions apply, the allow shall it is in issued at the One-Stop allow Center, City Hall, 456 W Olive Avenue. Specific procedure information is obtainable at the Building department web site.
InspectionsA minimum of two inspections room required, a utility release and also a final. The utility release inspection have to be scheduled as soon as the new panel is installed and ready to be hooked increase the PG&E supply. The building inspector will administer a energy release type which will must be listed to PG&E to have the supply hooked as much as the brand-new panel. A cable lath inspection is compelled for stucco repairs. A last inspection have to be scheduled after every one of the work-related is complete.
*